View Single Post
  #16  
Unread 05-20-2008, 10:57 PM
Smithers's Avatar
Smithers Smithers is offline
Admin
 
Join Date: Feb 2004
Location: San Luis Obispo, CA
Posts: 3,238
Send a message via AIM to Smithers Send a message via Skype™ to Smithers
Default

Since parts have been coming in at a pretty good rate I decided to put in a full day of work on the bike again. The bike is nearly done & I just need a couple more small things and to finish some work on the faring. Here is a rundown of things I got done recently:
  • The exhaust is new
  • Rear faring is repaired (I bought this shiny one with a crack)
  • Hoses are all changed out
  • Evo clutch slave cylinder is installed
  • Wiring is nearly done
  • Charcoal canister/hoses is gone
  • Instrument cluster is repaired and installed
  • Evo velocity stacks are installed
  • Rearsets are fixed up
  • Front frame sliders installed (still need to replace the right side one near the footpeg)
  • Evo license plate holder /eliminator installed
  • Fuel tank was adjusted to fit better than from the factory
  • Rashed up Aprilia riding jacket repaired
  • etc. etc.




Pretty long list of labor. Hopefully the ol' fuel cap and a replacement master cylinder will come in the mail soon and I can get this show on the road. JCR is hooking up the windscreen for me so things will be ready for some summertime ridin.
Reply With Quote